Centre of Maintenance at the A-6 Motorway
April 27, 2015
Santiago Bernabeu Stadium
April 28, 2015

Villena AVE Train Station

This project has four different fields of ac¬tion: Station Building High Speed Villena; Access roads to the station and external de¬velopment; Parking rating; Area platforms and access them from the main building.

The structural system of the station is based on a mixed structure of concrete and steel. Since the height of foundation to the roof of the station arises mreinforced concrete structure. The foundation, will be deep in the pile type executed in situ, except for parking that will be surface execution.

In the design of the facades and roofs were followed sustainability standard: Control of sunlight with glazed facade, with protec¬tions in south, east and west and free in ori-entaciónnorte. Flight deck on sun-exposed facades. Control of thermal and acoustic in-sulation glass and other materials. The proj¬ect e was looking for a design that allows the easy maintenance and security against intrusion and vandalism downstairs.

DOWNLOAD PDF

To see the full information in downloadable PDF format

Privacy Preference Center

Close your account?

Your account will be closed and all data will be permanently deleted and cannot be recovered. Are you sure?