Restoration of Cardenal Cisneros Square, A-6 Motorway
September 5, 2016
Engineering Bridges Master Plan North Area Bridges
September 5, 2016

Engineering Bridges Master Plan Center-North Area Bridges

The project involves the reinforcement of the bridges or its replacement for a new typology in order to support all the real trains expected to circulate through the diff erent lines, plus the design train called C+.

For such matter, 3D models have been undertaken of all the bridges with SAP 2000 software, where the current condition of the different elements has been taken into account. The stresses obtained from these models has been contrasted with handmade checks and assessed following the AREMA Standards.

As result of the analysis the following documentation has been developed for each bridge:

  • Cadastre report
  • Model report
  • Rehabilitation project
  • Reinforcement/ replacement project
  • DOWNLOAD PDF

    To see the full information in downloadable PDF format

    Privacy Preference Center

    Close your account?

    Your account will be closed and all data will be permanently deleted and cannot be recovered. Are you sure?